Share

Counting ore straight from drill core is usually said to start overstating tonnes at the mean grade. For lognormal grades, tonnes and metal swap between drill core and mining blocks at two different cut-offs instead, 1.85 and 0.54 times the mean in an illustrative domain, so a mine digital twin has to say which support and which change-of-support model sit behind any ore count.

Picture a mine digital twin that opens on drillholes hanging from their collars over a pit shell, each interval coloured above or below a cut-off, and a panel that reports the share of drilled metres that is ore. An executive would read that share as the ore count. The trouble is support: the volume each number was measured on is far smaller than the volume the mine will select on, and a count taken at one support does not hold at the other.

The reporting codes already draw that line. The guidance to Clause 20 of the JORC Code says a Mineral Resource "is not an inventory of all mineralisation drilled or sampled" [1]. Table 1, Section 3 asks the Competent Person to report the block size in relation to the average sample spacing, and any assumptions behind modelling of selective mining units [1]. The National Academies' 2024 report defines a digital twin as virtual constructs that are dynamically updated from the physical system, have a predictive capability and inform decisions, and it concludes that verification, validation and uncertainty quantification must be a continual process [10]. Updating and VVUQ can only mean something if the evidence layer the twin is built on carries its support.

So the first job of a mine twin is to carry evidence from the support it was measured on to the support the mine selects on, and to say how.

The pit-to-plant journey is a chain of supports

Follow one gold value from the ground to the mill.

StationSupportStatus
Fire-assay charge30 g or 50 g [12]measured
One metre of NQ core, split47.6 mm diameter [11]: about 1.78 litres, 4.8 kg whole, 2.4 kg as half coremeasured
Drill gridassumed 25 m: the core is about 2.85 ppm of the rock; at 50 m, about 0.71 ppmsampled
Selective mining unit (SMU)assumed 10 x 10 x 5 m, about 1,350 tmodelled
Stockpile, plant feed, plant productionwhatever was blendedblended, then measured again

The charge and core sizes are cited; the 25 m grid, the 10 x 10 x 5 m SMU and the 2.7 t/m3 density are assumed, and the ppm figures assume one vertical NQ hole per grid cell. The arithmetic is ours. A 30 g charge is one eightieth of the 2.4 kg of half core it was split from, and it stands for about one part in 45 million of a 1,350 t block. Only the first two rows are measurements. Everything a twin shows at selection support is modelled.

The CIM guidelines are careful about the far end of this chain. Section 6.10.2.2 notes that the resource model is in situ, with no allowance for dilution or mining losses; that stockpiles mean excavated material is not necessarily the plant feed of the same period; that a material flow diagram helps; and that the model should be compared with plant feed data rather than plant production data [2]. Dilution, stockpiles and plant reconciliation are later pieces in this series and are not modelled here. This piece stays on one link: from composite to SMU.

What averaging does, step by step

Krige's relation partitions the variance. The variance of point grades in the domain equals the variance of points within a block plus the variance of blocks within the domain [5][6]:

Krige's relation: points in the domain, points within a block, blocks in the domain
D2(⋅,V)  =  D2(⋅,v)  +  D2(v,V)D^2(\cdot,V) \;=\; D^2(\cdot,v) \;+\; D^2(v,V)

Selection sees only the last term. The within-block term is the variogram averaged over every pair of points in the block, written as gamma-bar. With the sill normalised to 1 and a domain large against the range, the variance reduction factor is one minus gamma-bar [5]. Averaging preserves the mean and shrinks the spread [5]. CIM section 6.9 requires the block model to be validated against the original data for smoothing and expected selectivity, and notes that this is generally done with a volume-variance or change-of-support correction, because block grades are predicted at a different volume from the data; section 6.4 asks for composites of approximately uniform support first [2]. Rossiter treats a sample as punctual when it is small against the block [6], which is how a 1 m composite stands against a 10 m SMU here.

Variance reduction factor, and the block log standard deviation for lognormal grades
f  =  1−γˉ(v,v),σb  =  ln⁡ ⁣(1+f CV2)f \;=\; 1-\bar{\gamma}(v,v), \qquad \sigma_b \;=\; \sqrt{\ln\!\left(1+f\,\mathrm{CV}^2\right)}

The worked default uses assumed values throughout: composite CV 2.0, SMU 10 x 10 x 5 m, a spherical variogram with a 50% nugget and a 40 m range. Gamma-bar, the nugget plus the spherical structure averaged over a 10 x 10 x 10 point grid inside the block, is 0.605. So f is 0.395, the block CV is 2.0 times the square root of 0.395, or 1.26, and the log standard deviations are 1.269 at composite support and 0.974 at SMU support.

The rule, and the assumption inside it

The usual statement splits on the mean grade. Riquelme and Ortiz, summarising Huijbregts, write that for high cut-off grades above the mean, the histogram of core grades may seriously overestimate the mined tonnage and mean grade [4]. Leuangthong, Neufeld and Deutsch sketch ore tonnes against SMU size as two different relationships, depending on whether the cut-off is above or below the mean grade [3]. Krige's 1951 paper describes a related effect, not this one: it explains statistically why Witwatersrand blocks listed as high grade were over-valued and those listed as low grade under-valued, when each block was valued from a limited number of samples [7]. That is the conditional bias of valuing blocks from few samples. The instrument leaves it out, because it assumes perfect selection on true block grades.

Why exactly the mean? The affine correction squeezes the distribution about the mean without changing its shape [5]: a block grade is the mean plus the square root of f times the composite's departure from it. A composite at the mean maps to the mean, so at a cut-off equal to the mean the two supports put the same tonnage above it. The tonnage line is the mean exactly. The same holds for any symmetric distribution.

Lognormal composites are positively skewed, and averaging changes their shape. In the default domain the composite skewness is 14.0 and the SMU skewness 5.76; the affine model keeps 14.0. Under the lognormal model averaging makes the grades less skewed, and the assumption that put the line at the mean no longer holds.

Where the lines are when averaging reduces skew

CIM names a change-of-support check among its validation steps, with the affine correction, the indirect lognormal correction and the discrete Gaussian model as examples [2]. For lognormal composites the last two return the same block distribution: lognormal, with the same mean and the block log standard deviation above. That is a standard result, re-derived here and checked in the instrument's unit test against the Hermite expansion the discrete Gaussian model is built on.

For a lognormal of mean m and log standard deviation sigma, the tonnage share above a cut-off c, and the share of all the metal above it, are:

Tonnage and metal shares above a cut-off, lognormal grades
T(c)  =  Φ ⁣(ln⁡(m/c)σ−σ2),Q(c)  =  Φ ⁣(ln⁡(m/c)σ+σ2)T(c) \;=\; \Phi\!\left(\frac{\ln(m/c)}{\sigma}-\frac{\sigma}{2}\right), \qquad Q(c) \;=\; \Phi\!\left(\frac{\ln(m/c)}{\sigma}+\frac{\sigma}{2}\right)

Set the composite curve equal to the block curve and solve. The tonnage curves cross at one cut-off and the metal curves at another, symmetric about the mean in log grade:

The metal line and the tonnage line
cQ  =  m e−σcσb/2,cT  =  m e+σcσb/2c_Q \;=\; m\,e^{-\sigma_c\sigma_b/2}, \qquad c_T \;=\; m\,e^{+\sigma_c\sigma_b/2}
Support split route
One cut-off, two supports: tonnes and metal swap at different grades.
1.85 xthe tonnage line: core counting overstates ore tonnes only above this multiple of the mean (lognormal or DGM)
A schematic route from a shallow pit in the foreground to a weigh beam at the plant end. Two belts of equal width leave the pit: the left carries drill core composites, starting from a row of vertical drillholes 25 m apart; the right carries SMU blocks of 10 by 10 by 5 m, drawn at the same scale. At the gate each belt splits. The ore part runs on with a width equal to the tonnage share above cut-off, 26.3% for core and 31.3% for SMU, carrying a load whose height is the grade above cut-off, 2.80 g/t for core and 2.19 g/t for SMU, so its cross-section is the metal share, 73.7% and 68.7%. The waste part peels a short way outward to a low dump on each side. Each belt carries a ghost of the other support's edge and cross-section. The gate beam dips towards the SMU: core shows −16.0% tonnes. The plant beam dips towards drill core: core shows +7.3% metal. A gauge post at the gate shows the cut-off at 1.00 x mean, 1.00 g/t, and the window from the metal line at 0.54 x to the tonnage line at 1.85 x, under the lognormal change-of-support model (equal to the discrete Gaussian model for lognormal composites). Inside the window: core counting shows fewer tonnes but more metal than SMU selection. Illustrative and synthetic.
Inside the window: core counting shows fewer tonnes but more metal than SMU selection.
Tonnage share above cut-off, core vs SMU
26.3% vs 31.3%, −16.0%
Metal share above cut-off, core vs SMU
73.7% vs 68.7%, +7.3%
Grade above cut-off, core vs SMU
2.80 g/t vs 2.19 g/t, +27.8%
Metal line and tonnage line
0.54 x (0.54 g/t) and 1.85 x (1.85 g/t)
Gamma-bar and f
0.605 and 0.395
Sigma core and sigma SMU
1.269 and 0.974
Skewness, core vs SMU
14.00 vs 5.76
One SMU at 2.7 t/m3
1,350 t
Readouts of the support split route at the current settings
Tonnage share above cut-off, core vs SMU26.3% vs 31.3%, −16.0%
Metal share above cut-off, core vs SMU73.7% vs 68.7%, +7.3%
Grade above cut-off, core vs SMU2.80 g/t vs 2.19 g/t, +27.8%
Metal line and tonnage line0.54 x (0.54 g/t) and 1.85 x (1.85 g/t)
Gamma-bar and f0.605 and 0.395
Sigma core and sigma SMU1.269 and 0.974
Skewness, core vs SMU14.00 vs 5.76
One SMU at 2.7 t/m31,350 t
RegimeInside the window: core counting shows fewer tonnes but more metal than SMU selection.
Illustrative domain
drill core lane: composites, point supportSMU lane: blocks, selection supportore load: width is tonnes, height is grade, so its cross-section is metalghost: the other support's belt edge and cross-section, in its colourbeams dip towards the support that shows more: tonnes at the gate, metal at the plant; level means equalwaste to dump: width is 1 minus the ore sharecut-off on the gaugethe window: metal line at the bottom, tonnage line at the top
Illustrative: synthetic lognormal distributions and a synthetic spherical variogram; not data from any deposit; not a resource or reserve estimate. SMU curves assume perfect selection on true block grades, with no information effect, smoothing or dilution, so they are not plant feed. Only the blocks and the drillhole spacing are to scale; the rest of the route is schematic, and the conveyor is a metaphor, not a haulage claim. The beams show the sign of each difference, compressed so that a small one is still visible; level means equal, and the size of each difference is in the labels and readouts.
MODELLED: composite sigma = sqrt(ln(1 + CV^2)); gamma-bar = nugget + (1 minus nugget) x the mean spherical variogram over a 10 x 10 x 10 point grid inside the block, nugget applied analytically; f = 1 minus gamma-bar; block CV = CV x sqrt(f). Lognormal tonnage above c is Phi(ln(m/c)/sigma minus sigma/2) and metal is m Phi(ln(m/c)/sigma + sigma/2), so the lines sit at m exp(plus or minus sigma_c sigma_b / 2). That the indirect lognormal correction and the discrete Gaussian model coincide for lognormal composites is a standard result, re-derived here and checked in the unit test. Affine: Z_b = m + sqrt(f)(Z minus m).
SOURCED: the copper-like mean, 0.44% Cu, is the median grade of the 422 deposits in the USGS general porphyry copper model (OFR 2008-1155, Table 1); its CV of 0.8, nugget of 20% and range of 80 m are assumed. The gold-like domain (mean 1.00 g/t, CV 2.0, nugget 50%, range 40 m) is assumed throughout. Density 2.7 t/m3 is assumed.
Two supports, one cut-off. A schematic pit-to-plant route: the left belt carries drill core composites, the right carries SMU blocks, and both start at the same width, the whole of each support's tonnage. At the gate each belt splits. The ore belt's width is the tonnage share above the cut-off and the load on it is as tall as the grade above the cut-off, so the load's cross-section is the metal share; a ghost in the other support's colour marks the other belt's edge and cross-section. The waste peels off to a low dump. The gate beam dips towards the support that sends more ore tonnes past the cut-off, the plant beam towards the support that delivers more metal, and each is level only where the two agree. The gauge post carries the cut-off in amber on a log scale from 0.2 to 3.2 times the mean, and the pale window between the metal line and the tonnage line. It opens at a cut-off equal to the mean, where the usual rule says core starts to overstate tonnes: the core belt is the narrower and the two beams dip opposite ways. Drag the cut-off and the gate beam levels only at the top of the window, the plant beam only at its bottom. Turn on shape kept and the tonnage line snaps to the mean, which is the rule of thumb reproduced as one model's assumption. Everything is illustrative: synthetic lognormal grades and a synthetic variogram, not data from any deposit and not a resource or reserve estimate; the SMU curves assume perfect selection, with no information effect, smoothing or dilution. The copper-like mean is the USGS median of 422 porphyry deposits; its other values are assumed. Drag to turn, pinch or hold Ctrl and scroll to zoom, double-click to reset.

The instrument opens at a cut-off equal to the mean, the rule's line. The metal line is at 0.54 times the mean and the tonnage line at 1.85 times. At the mean, core shows 16.0% fewer tonnes than SMU selection, 7.3% more metal and 27.8% higher grade. The core ore belt is the narrower of the two and its load the taller, and the two beams dip opposite ways: the gate beam towards the SMU for tonnes, the plant beam towards core for metal. Drag the cut-off up and the gate beam comes level only at 1.85 times the mean, where the ghost of the SMU belt's edge crosses onto the core belt. Drag it down and the plant beam comes level at 0.54. At half the mean, metal agrees to within 0.4% while tonnes differ by 21.0% and grade by 26.2%.

That gives three regimes. Below the metal line, core understates tonnes and metal, and both beams dip towards the SMU. Between the lines, it understates tonnes but overstates metal, and the beams dip opposite ways. Above the tonnage line, it overstates all three, and both beams dip towards core. In the default domain, grade above cut-off is overstated at every cut-off on the scale.

Switch on shape kept (affine) and the tonnage line snaps to exactly 1.00 times the mean: the rule of thumb, reproduced as one model's assumption. Drag the composite CV towards 0.1 and both lines collapse onto the mean, at 1.003. Skew and the variogram set where the tonnage line sits. CV 1 puts it at 1.27 times the mean and CV 3 at 2.55, and at a 10 m SMU the nugget control moves it from 2.13 with no nugget to 1.56 at 80%. Block size moves it less: from a 5 m to a 25 m SMU edge it goes from 1.89 to 1.72 times the mean at the default 50% nugget, and from 2.18 to 1.97 with none. Block size still decides how much selectivity is lost: Jara and co-authors show with metal-tonnage curves that in situ selectivity falls as blocks grow, while dilution rises as they shrink [8].

The copper-like preset borrows one number, a mean of 0.44% Cu, the median grade of the 422 deposits in the USGS general porphyry copper model [9]. Its CV of 0.8, 20% nugget and 80 m range are assumed. The lines fall at 0.355% and 0.546% Cu. An assumed 0.25% Cu cut-off sits below the window, where core shows 7.6% fewer tonnes and 1.6% less metal at 6.6% higher grade.

The correction is narrow. Riquelme and Ortiz wrote "may", for high cut-offs, and the CCG figure is a schematic [3][4]. Once averaging is allowed to reduce the skew of lognormal grades, the tonnage line moves above the mean and the metal line below it, and between them a core count and a selection count disagree in opposite directions on tonnes and on metal. The direction comes from the sign of the skew. Mirror a lognormal about its mean and the tonnage curves mirror with it, so for a negatively skewed grade the tonnage line falls below the mean instead. A real domain has to be run through a discrete Gaussian model or simulation on its own composites.

What this asks of a mine twin

EarthScan's mining workflows are in development. None is released or accepted, and nothing below describes a capability. It is what a twin built on site context and borehole evidence must do before it reports a number at any cut-off.

  • Every grade and every ore count must carry its support, and a number without one must not be shown.
  • The evidence layer (collars, down-hole surveys, logged intervals, the coordinate reference system and the original records) must stay at composite support and must never be summed into an ore share. JORC Table 1 already asks about the accuracy and quality of collar and down-hole surveys [1].
  • Any count at selection support must name its SMU, its variogram and its change-of-support model as a versioned, reviewable assumption.
  • The same count must be available under the affine correction and under the discrete Gaussian model, side by side, so the person accepting the number sees the choice.

The public EarthScan Twin page [13] is a general entry point to our digital-twin work. It is not a walkthrough of these mining workflows, and nothing here implies a demonstration of them exists.

Where we have done the adjacent work

Our verified delivery is in oil and gas, not mining. On a well-to-well correlation project we kriged bedding-density logs across 13 vertical wells at roughly 40 to 80 m spacing, testing Gaussian, linear and exponential variograms [14]. The step that shaped the method came before any kriging: we measured which curves had lateral structure. Bedding density did. Fracture density did not, so it was deliberately left unkriged. The mining step adds what that work did not need, a change of support from the sample to the selection volume, stated as a model and checked here against an independent calculation. We make no claim of mining delivery, customers or outcomes.

A same-day piece makes a neighbouring point from the imaging side: a value reported below the measurement's own resolution was supplied, not measured [15]. That is about recovered detail. This one is about averaging, and it runs the other way.

What to do on Monday

  1. Never let a twin's evidence layer report an ore share. Coloured intervals are evidence at composite support, and intervals alone do not prove a correlated orebody.
  2. Compute where your own domain's lines sit, from your composites and variogram, with a discrete Gaussian model or conditional simulation on the real data, before quoting tonnes at a cut-off near the mean.
  3. Treat agreement on contained metal near the lower line as uninformative about tonnes and grade. In the default domain at half the mean, metal agrees to 0.4% while tonnes differ by 21.0%.
  4. Report tonnes, grade and metal separately, each at a stated support.
  5. Take the change-of-support model to the Competent or Qualified Person as a material assumption, consistent with JORC Table 1 and with the change-of-support check CIM section 6.10.1 lists among its validation steps [1][2].

If your twin, or the one you are being shown, reports an ore count, ask it two questions: at what support, and under which change-of-support model. We will work through where those lines sit for your own composites and variogram.

Key takeaways

  1. The chain from ground to mill is a chain of supports: a 30 g charge from 2.4 kg of half NQ core, core that is about 2.85 ppm of the rock on an assumed 25 m grid with one vertical hole per cell, and an assumed 10 x 10 x 5 m SMU of about 1,350 t, so one charge stands for about one part in 45 million of a block.
  2. Averaging preserves the mean and shrinks the variance by f = 1 minus gamma-bar; in the illustrative default, gamma-bar is 0.605, f is 0.395 and the log standard deviation falls from 1.269 to 0.974.
  3. The rule that core counting starts to overstate ore tonnes at the mean grade is exact under the affine correction, which keeps the distribution's shape, or for symmetric grades.
  4. Averaging lognormal grades reduces their skew, 14.0 to 5.76 in the default domain. Under the lognormal or discrete Gaussian model the tonnage line sits at m exp(sigma_c sigma_b / 2) and the metal line at m exp(-sigma_c sigma_b / 2): 1.85 and 0.54 times the mean. Skew and the variogram set where it sits; block size moves it less.
  5. At a cut-off equal to the mean, core shows 16.0% fewer tonnes, 7.3% more metal and 27.8% higher grade than SMU selection; at half the mean, metal agrees to 0.4% while tonnes differ by 21.0%.
  6. Below the metal line core understates tonnes and metal, between the lines it understates tonnes but overstates metal, above the tonnage line it overstates all three, and grade is overstated throughout.
  7. A mine twin should attach a support to every grade and count, keep drillhole evidence out of ore shares, and name its SMU, variogram and change-of-support model as a reviewable assumption.

Limitations

The lognormal model is an assumption about the composites inside one domain, and nothing cited here tests it. The one USGS figure used, the 0.44% Cu median, is a statistic of deposit-average grades across 422 deposits [9], a different population from the composites inside a domain, and it says nothing about their distribution. Real domains need a discrete Gaussian model or conditional simulation on their own composites, and a negatively skewed grade moves the tonnage line the other way.

Every distribution and variogram in the instrument is synthetic and illustrative. The copper-like preset takes only its mean from the USGS model.

The SMU curves assume perfect selection on true block grades. The information effect, kriging smoothing, dilution and ore loss are not modelled, so the SMU curve is an upper bound on selectivity and not delivered plant feed. Composites are treated as point support, and the bench is fixed at 5 m.

Gamma-bar comes from a 10 x 10 x 10 point grid with the nugget applied analytically. It reads 0.6046 at that grid, 0.6048 at 14 points per axis and 0.6050 at 40, so the third decimal is stable to rounding.

Nothing here is a resource or reserve statement, a recovery figure or a site condition. Inferred resources are not reserves, and an assay grade is not a plant recovery.

References

[1] Joint Ore Reserves Committee. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code), 2012 edition. Clause 20 and its guidance, Clause 21, and Table 1, Sections 1 and 3. The JORC Code 2012 (PDF)

[2] Canadian Institute of Mining, Metallurgy and Petroleum. CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines, adopted 29 November 2019. Sections 6.4, 6.9, 6.10.1 and 6.10.2.2. CIM Estimation Best Practice Guidelines 2019 (PDF)

[3] O. Leuangthong, C. Neufeld, C. V. Deutsch. Optimal Selection of Selective Mining Unit (SMU) Size. Centre for Computational Geostatistics, Report 5, 2003. Figure 1 is a schematic. Optimal Selection of SMU Size, CCG Report 5 (PDF)

[4] A. I. Riquelme, J. M. Ortiz. A general approach to the assessment of uncertainty in volumes by using the multi-Gaussian model. arXiv:1907.08264, Section 4. Riquelme and Ortiz on arXiv

[5] M. J. Pyrcz. Volume-Variance Relations. Applied Geostatistics in Python, GeostatsPy demonstration book. Pyrcz, Volume-Variance Relations

[6] D. G. Rossiter. Applied geostatistics, Exercise 10: Change of support. ITC, 2014. Rossiter, change of support exercise (PDF)

[7] D. G. Krige. A statistical approach to some basic mine valuation problems on the Witwatersrand. Journal of the Chemical, Metallurgical and Mining Society of South Africa, 52(6):119-139, December 1951. Cited for the conditional bias of valuing blocks from few samples, not for the volume-variance effect. Krige 1951 (PDF)

[8] R. Jara, A. Couble, X. Emery, E. Magri, J. Ortiz. Block size selection and its impact on open-pit design and mine planning. Journal of the Southern African Institute of Mining and Metallurgy, 106(3):205-211, 2006. Read from the repository abstract only. Jara et al. 2006, Universidad de Chile repository record

[9] D. A. Singer, V. I. Berger, B. C. Moring. Porphyry Copper Deposits of the World: Database and Grade and Tonnage Models, 2008. U.S. Geological Survey Open-File Report 2008-1155, Table 1. USGS Open-File Report 2008-1155 (PDF)

[10] National Academies of Sciences, Engineering, and Medicine. Foundational Research Gaps and Future Directions for Digital Twins, 2024. Chapter 2, including Conclusions 2-2 and 2-4. National Academies, digital twins report, Chapter 2

[11] Queensland Department of Transport and Main Roads. Geotechnical Terms and Symbols, form F:GEOT 017/10, for the NQ core diameter. Queensland TMR geotechnical terms and symbols (PDF)

[12] ALS. Gold by fire assay, method description listing 30 g and 50 g sample aliquots. ALS gold by fire assay

[13] EarthScan. EarthScan Twin, public page; a general entry point, not a walkthrough of any mining workflow. EarthScan Twin

[14] EarthScan case study, the only delivery this piece draws on, in oil and gas: Correlating wells with kriging: from per-well picks to a 3D field picture.

[15] The same-day piece on what super-resolution entitles you to decide: Recovered is not measured.

Tarry Singh
Tarry Singh

Founder & CEO

More from EarthScan

Related research

All insights →
More Data, A Narrower Band, Less Truth Inside It: Ensemble Collapse Under a Reservoir Twin
Insight

More Data, A Narrower Band, Less Truth Inside It: Ensemble Collapse Under a Reservoir Twin

Physics-Informed Neural Networks for the Elastic Wave Equation
Research

Physics-Informed Neural Networks for the Elastic Wave Equation

70% Past Peak Is a Rule, Not a Reading: What the Mature-Asset Denominator Is Actually Counting
Insight

70% Past Peak Is a Rule, Not a Reading: What the Mature-Asset Denominator Is Actually Counting

Stay ahead

EarthScan insights, in your inbox.

Field-tested research on subsurface and energy-transition AI. About twice a month. No noise.

We use your email only for this newsletter. Unsubscribe anytime Privacy.